Troops 251 set out to build a new trail at camp. The troop planned the trail based on the long range property plan. They then brainstormed the idea to come up with a plan and materials list. The next step was to bring the plan and put it on site.
![]() First the trail was laid out with ribbons and string |
![]() Downed limbs and debris were cleared from the trail |
![]() Stock pile of chips donated by the city of Geneva |
![]() The girls used wheelbarrows to move the chips down the trail |
![]() and more wheelbarrows |
![]() Crews worked along the trail leveling out the chips |
![]() Someone has to test it |
![]() Cameo shot of part of the group |
Many thanks to these hard working girls that performed a project that will be used by thousands each year for many years.