Troops 251 set out to build a new trail at camp. The troop planned the trail based on the long range property plan. They then brainstormed the idea to come up with a plan and materials list. The next step was to bring the plan and put it on site.

Untitled-4 copy.jpg (22308 bytes)
First the trail was laid out with ribbons and string
Untitled-1 copy.jpg (27786 bytes)
Downed limbs and debris were cleared from the trail
Untitled-8 copy.jpg (25368 bytes)
Stock pile of chips donated by the city of Geneva
Untitled-6 copy.jpg (30219 bytes)
The girls used wheelbarrows to move the chips down
the trail
Untitled-7 copy.jpg (27705 bytes)
and more wheelbarrows
Untitled-2 copy.jpg (29168 bytes)
Crews worked along the trail leveling out the chips
Untitled-5 copy.jpg (24237 bytes)
Someone has to test it
Untitled-3 copy.jpg (29721 bytes)
Cameo shot of part of the group

Many thanks to these hard working girls that performed a project that will be used by thousands each year for many years.